Track maintenance work has been scheduled for November 23 through November 25 between the Central West End MetroLink Station and the Civic Center MetroLink Station.
From the beginning of service to the end of service each day, MetroLink trains will not operate between the two stations. Instead, MetroLink Station Shuttles will be available to transport riders between the Central West End, Cortex, Grand, Union Station, and Civic Center MetroLink Stations. Riders traveling through this area should allow an extra 30 minutes for their commutes.
MetroLink trains operating outside of the affected area will operate every 20 minutes. Blue Line trains will operate between the Shrewsbury-Lansdowne I-44 and Central West End Stations. Red Line Trains will operate between Lambert Airport and the Central West End, as well as operating between the East Riverfront and Shiloh-Scott Stations in Illinois.
Normal service will resume on Tuesday, November 26.
Metro Transit encourages riders with questions to reach out to Metro Transit Information at 314-231-2345 (phone) or 314-207-9786 (text).